Horizontal Dewatering

dewatering drilling

The installation of horizontal dewatering systems is relatively easy. A trencher installs an unperforated pipe followed by a synthetic pipe. The drain length is determined by the drain diameter, soil conditions and the water table.

In general drain lengths of 50 meters is common. After installation of the drainpipe a pump is connected to the drain. After the water table has been lowered, the intended construction can start. After the construction is finished the pumps are stopped, and the water table will rise again. Installation depths up to 6 meters are common.

AQUA SOILTECH offer excellent Horizontal Dewatering system at highly affordable prices. Kindly CONTACT US for more details.

Comments are closed.